Mérida – Cancún highway

Mérida – Cancún highway CLIENT: Consorcio del Mayab, S.A. de C.V. LOCATION: Mérida / Cancún. SCOPE: Technical Reviewer for the road adjustments on the Mérida – Cancún Highway. Technical review service for the verification and monitoring of the implementation of road adjustments resulting from the construction of the Maya Train, Section 4, to be executed…

AIFA JUNCTION ROADS

AIFA connections CLIENT: OPCEM LOCATION: Estado de México SCOPE: Construction control services, supervision, and quality control for the junction that will connect the Mexiquense Exterior Circuit with the Felipe Ángeles International Airport (AIFA). The project includes 14 km of branches based on prefabricated concrete and steel beams.

Transisthmian Train

Transisthmian Train CLIENT: Ferrocarril del Istmo de Tehuantepec / Corredor Interoceánico LOCATION: Oaxaca, Veracruz, Tabasco, and Chiapas. SCOPE: Technical supervision for the construction of the “Correction of 56.7 km of Curvature and Slope in the Section from ‘Mogoñe’ to ‘La Mata’ and Rehabilitation of 143.3 km of railway tracks on Line Z, divided into seven…

Subway Line 3

Subway Line 3 CLIENT: Sistema de Transporte Colectivo / COVITUR / SUPERVISA LOCATION: Mexico City. SCOPE: Supervision of the construction of Universidad Station, terminal station, and roadway Copilco to Ciudad Universitaria. The works consisted of excavation and, given the characteristics of the soil, explosives were used. Works on the sub-base, base, and pavements, including the…

Line 1 Suburban

Line 1 Suburban CLIENT: Colinas de Buen S.A. de C.V / Ferrocarriles suburbanos LOCATION: Tultepec, Estado de México. SCOPE: Supervision of roadways for the expansion of Line 1 of the Lechería – AIFA Suburban Train. The work consists of paving 6 secondary roadways with different cross-sections, using hydraulic concrete for the riding surface. The works…

Nivea Plant

Nivea Plant CLIENT: BDF Beiersdorf NIVEA LOCATION: Silao, Guanajuato SCOPE: Sacmag develops all the engineering disciplines for the expansion of an industrial facility engaged in the manufacture of cosmetic products. The expansion will have over 25,000 m². Infrastructure: – Growth of 100% the production and logistics floor. – Principle of Modular Layout for a quick…