Mayan Train

Mayan Train CLIENT: ICA / Consorcio Acciona – Grupo México / Consorcio Azvindi / Greenfield SPV VIII LOCATION: Chiapas, Tabasco, Campeche, Yucatán, and Quintana Roo. SCOPE: Structural engineering, on-site monitoring of the geotechnical campaign, geometric design and earthworks for Section 5. Geotechnical exploration campaign for Section 5 South. Quality control tests to construction materials for…

Development of the Isthmus

Development of the Isthmus CLIENT: Secretaría de Marina LOCATION: Oaxaca, Veracruz, Tabasco, and Chiapas. SCOPE: Technical supervision and quality control for the work of studies, projects, and construction of works and ancillary services on the “Z” line of the general railway communication line of the Istmo de Tehuantepec railroad in the states of Veracruz de…

Malta Plant

Malta Plant CLIENT: Malteurop LOCATION: Meoqui, Chihuahua. SCOPE: Construction management of a malt production plant located in Meoqui, Chihuahua, which will achieve an annual production capacity of 120,000 tons. The construction area is 20,000 m², including raw material silos, production areas, warehouses, administrative buildings, access roads, parking lots, and green areas. The plant was inaugurated…

Grupo Modelo Plant

Grupo Modelo Plant CLIENT: Grupo Modelo LOCATION: Ciudad Sahagún, Hidalgo. SCOPE: Engineering, construction management and supervision of the GF Centro Plant, Grupo Modelo. Review of technical information provided by Grupo Modelo. Monitoring of execution regarding compliance with design specifications and location.Assurance of the use of updated drawings and documents during the committed period of time.…

Metallurgical Plant

Metallurgical Plant CLIENT: Metalúrgica Met-Mex Peñoles LOCATION: Torreón, Coahuila SCOPE: – Structural survey and structural scanning – Mechanical integrity study – Detailed engineering and on structural rehabilitation and reinforcement Structural analysis update program for the Zinc, Smelting, and Refinery plant buildings (constructed in 1973) due to structural risks and visible corrosion effects from the process.

Velardeña Zinc Mine

Velardeña Zinc Mine CLIENT: Industrias Peñoles LOCATION: Cuencame, Durango. SCOPE: Plant expansion to 2,500 m.t.p.d. milling, re-milling, zinc, lead, and silver. Supervision services for the construction of the mine expansion for the extraction of lead, copper, and zinc, including earthworks, excavations, foundations, installation of a new mill, flotation tanks, thickeners, equipment installation, and civil structure.