NAICM (Texcoco Airport)

Airside Engineering Project for the Texcoco Airport, which was planned to obtain a LEED certification

Cancun International Airport Control Tower

Technical, Administrative Supervision and Quality Control Services of the Work

PetStar Recycling Facility

Work coordination and administrative control of a PET recycling plant

Glass Plant

Engineering project for 9 batteries of concrete silos in a glass plant that supplies bottles for bottling beer from Cervecería Cuauhtémoc Moctezuma.

HONDA PLANT

Due diligence, civil engineering and complete construction management for its construction.

BMW PLANT

Engineering and architectural services for the expansion of the facilities and for the construction of the TEM Building for the manufacture of batteries used for electric vehicles.

Malecon Americas Cancun

Detailed engineering for the electrical, hydraulic and sanitary installations, fire control systems and voice and data routing.

Mexico City Metrobus

Supervision on lineas 3, 5, 6 and 7 of the Mexico City Public Transportation System.

Interoceanic Corridor of the Isthmus of Tehuantepec

Project Management and Supervision Office of more than 1,200 kilometers of roads.

Interurban High Speed ​​Train Mexico – Valley of Mexico

Supervision of the construction and complementary works of Section 3 of the Elevated Viaduct

El Cuchillo Aqueduct

Independent engineer service during the manufacturing process of steel pipe and pumping equipment, as well as release in the right of way for installation.

Tenorio Treatment Plant

Engineering for the Treatment Plant with average flow capacity of 1,050.00 liters per second.

Desalination Plant

Engineering for a desalinated seawater production plant for human consumption. 200 lt/sec.

Atotonilco Water Treatment Plant

Development of the electrical, mechanical and instrumentation and control engineering project

Istmeño Wind Project

“Owner engineer” field studies for the largest wind project in Latin America (132 generators)

Turbogeneration

Engineering and construction assistance for Power Generation Plant II.

Acapulco General Hospital

Integral Project for the construction of the general hospital in Acapulco with 120 beds.

Punta Reforma Tower

Development of the integral engineering project under the Green Building standards.

Dos Bocas Refinery

Detailed engineering services for Phase II (OBCE), scope of package No. 6, project in execution, and integral engineering services for the systems through the use of the Smart Plant platform in MEBI and METI models.

Miguel Hidalgo Refinery

Engineering for the Collection and Compression Terminal of the LAKACH field

Altamira Maritime Terminal

Supervision and quality control for the expansion of the existing dock in the multi-use cargo terminal.

Maritime Customs of the Port of Veracruz

Direction of the corresponding works, coordination of initiation, execution, completion and approval by the client.

Sky Santa Fe

Coordination and Supervision of the works of a project for 2 apartment towers, Oriente A and B Towers

Shark Tower

Engineering of the installations for the construction of a mixed-use building.

El Chopo University Museum

Supervision of the works consisting of the Executive Project of installations and construction of the architectural superstructure of recovery and expansion.

Azteca Stadium

MEP installation design of 35,000 m2 of construction of areas to be remodeled.

ON-SHORE GAS PIPELINES

Class V cost estimate for the project of a future gas pipeline of approximately 200 km.

ON-SHORE PIPELINES

"Cactus" measurement, regulation and control station of the Cuxtal Phase I project, development of dimensional analysis of EMRyC and development of hydraulic model, flexibility analysis, model calibration and development of the hydraulic analysis.

Hotel Dreams Riviera Cancun

Coordination, preparation of base budget and supervision of the works

Nivea plant

Development of engineering for the expansion of 25,000 m2 of an industrial plant that manufactures cosmetic products.

San Julián Mine

Executive project for the construction of the grinding, flotation and filtering process plant and thickening areas, reagents, fire protection system, laboratories, dressing rooms, warehouses and workshops.

Social rehabilitation center in Chiapas

Executive project of the Minimum and Medium Security Penitentiary Center.

Mayan Train

Structural engineering, monitoring of the on-site geotechnical campaign, geometric design and earthworks for Section 5.

Leave a Reply

Your email address will not be published. Required fields are marked *

Post comment